How to compare ADU contractor bids

Ask each builder to price the same project, then line up the quotes by scope before you compare the totals.
Sources checked November 26, 2026
Give builders the same project brief
Share the floor area, project type, drawings or sketch, finish expectations, and site constraints. Ask each builder to specify the assumed utility runs, demolition, excavation, and access. Request a written scope, schedule, allowances, and exclusions.
What to ask every bidder
Copy these questions into your request for a quote. Add any local or site checks from your ZIP result, and ask for an example of a project the builder permitted through the same office.
- Who prepares the drawings, submits the permits, responds to corrections, and schedules inspections?
- Which fees and utility connections or upgrades are included? Which are separate costs?
- What demolition, excavation, or access work does the quote assume?
- Who will confirm any fire access, drainage, or septic checks that apply, and what work has been priced?
- What is still an allowance or exclusion? What would trigger a change order?
Put every item in one column
Use one column per bid. Add known costs outside the construction contract, such as design, permit fees, or work by a utility provider. Keep undecided items visible until you get a price. If the construction quote already includes site work or utilities, leave those separate worksheet entries blank.
Verify the business before signing
Look up the license number with the California Contractors State License Board and compare the listed business name with the name on the bid. Review current status and classifications, ask for relevant references, and read the written contract and change-order process before committing.