Long Beach city ADU permits

At a glance

Long Beach directs applicants to the Permit Center with a complete plan package. Ask Planning to identify any additional approval before scheduling a building permit submittal or accepting a standard turnaround assumption.

Parcels inside Long Beach city limits.

Sources checked

Each check still depends on its stated conditions.

The routine steps

Standard

Start with the building permit

Applies when Parcels inside Long Beach city limits.

Long Beach directs applicants to the Permit Center with a complete plan package.

Official guidance Long Beach ADU permit process
ADU process steps 1 and 2

What can complicate the job

Parcel check

Screen coastal and historic status before filing

Applies when A parcel in the Coastal Zone or a historic district.

The city identifies distinct coastal and historic approval requirements and excludes those parcels from the over-the-counter option.

Official guidance Long Beach ADU permit process
ADU process steps 1 and 2

  • Permit path
  • Schedule

Our take Ask Planning to identify any additional approval before scheduling a building permit submittal or accepting a standard turnaround assumption.

Ask your builder Which overlay did you check, and who handles the additional approval if it applies?

Ask for an example from the same permitting agency and a written scope that says who handles each filing. Open the bid checklist.

Compare the local permit guides

Overlapping ZIP areas (20)

Each ZIP can include multiple jurisdictions. Confirm the parcel’s permit office.