Oakland city ADU permits

At a glance

Start with Oakland’s route for the type of primary residence and ADU proposed. Ask Planning about the address before paying for a plan or bidding it as a standard job.

Parcels inside Oakland city limits.

Sources checked

Each check still depends on its stated conditions.

The routine steps

Standard

Start with the building permit

Applies when Parcels inside Oakland city limits.

Start with Oakland’s route for the type of primary residence and ADU proposed.

Official guidance City of Oakland ADU permit routes
Accessory dwelling unit application options

What can complicate the job

Parcel check

Check whether a preapproved plan can be used on the lot

Applies when A detached new unit that would use an Oakland preapproved plan.

Oakland’s preapproved guidance says final approval is site-specific and some districts or neighborhoods may not be eligible for those plans.

Official guidance City of Oakland preapproved plan instructions
Accessory dwelling unit application options

  • Design
  • Cost

Our take Ask Planning about the address before paying for a plan or bidding it as a standard job.

Ask your builder Who checks that this plan is eligible for this parcel, and which site items are excluded?

Ask for an example from the same permitting agency and a written scope that says who handles each filing. Open the bid checklist.

Compare the local permit guides

Overlapping ZIP areas (18)

Each ZIP can include multiple jurisdictions. Confirm the parcel’s permit office.