San Diego city ADU permits

At a glance

Start with the building permit, then check the parcel’s coastal overlay before assuming it’s a routine job. A detached unit or garage conversion can take a different permit path there.

Parcels within the City of San Diego.

Sources checked

Each check still depends on its stated conditions.

The routine steps

Standard

Use the city building permit checklist

Applies when ADU projects in the City of San Diego.

Development Services requires a building permit and publishes different submittal guidance for single-dwelling and multi-dwelling sites. The package can include site, architectural and structural plans.

Official guidance San Diego Information Bulletin 400
Permit Application Process and Requirements

What can complicate the job

Parcel check

Screen the coastal overlay before quoting

Applies when Projects in the Coastal Overlay Zone, including new detached space, increases in habitable area or conversions of non-habitable space.

The city’s bulletin identifies circumstances in which an ADU or JADU in the overlay needs a Coastal Development Permit. Certain projects can be processed through the building permit if city findings are met. The city provides a parcel tool to check overlay boundaries.

Official guidance San Diego Information Bulletin 400 · San Diego zoning and parcel tools
Coastal Development Permit Requirement and city parcel tools

  • Permit path
  • Design
  • Schedule

Our take Check the actual parcel before accepting a generic citywide quote. On a coastal lot, a designer or builder who can explain the review pathway for a similar parcel is worth bringing in early.

Ask your builder Can you show me the parcel’s overlay and explain whether you’re pricing a Coastal Development Permit, what documentation it needs, and who handles it?

Ask for an example from the same permitting agency and a written scope that says who handles each filing. Open the bid checklist.

Compare the local permit guides

Overlapping ZIP areas (59)

Each ZIP can include multiple jurisdictions. Confirm the parcel’s permit office.